- Early Contractor Engagement to provide methodology to advance the Super Structure by Constructing in situ walls 12.5m high x 13 number
- Design Doka Formwork and Temp Works propping
- Fabricate Formwork on site and Install
- Install prefabricated Reinforcing
- Pour utilising custom sized tremipipe on boom pump